District of Columbia
No state summary added yet.
Population
—
Est. GDP
—
Active Vertiports
0
0 cities tracked
Market Hubs in District of Columbia
No specific city dashboards linked yet.
Regional Infrastructure
Completed
BETA Multimodal Charging Network
BETA Multimodal Charging Network BETA Technologies has established the first widespread interoperable charging network for electric aircraft in the U.S. These "Charge Cubes" follow the CCS standard and are installed at over 20 airports along the East Coast and Midwest. Each station serves as a dual-use facility, capable of charging both eVTOL aircraft and ground-based electric vehicles. This network is the primary backbone for regional flight testing and early commercial logistics operations.
